  • This project involves reconstructing and widening a 2.2- mile section of roadway into a 4-lane minor arterial from FM 2770 to Veterans Drive. It includes upgrading Old Stagecoach Road from RM 150 to Center Street into 3- to 4-lane arterials. Additionally, two roundabouts are planned at Old Stagecoach Road with Six Creeks and at Old Stagecoach Road with Center Street (off-system) to enhance traffic flow and safety.

  • 2.2 miles

  • $41.2 million